Penjadwalan Pekerjaan dengan Metode N Job dan M Machine untuk Memperoleh Makespan Optimal di PT. 123

Liyanto, Alex (1995) Penjadwalan Pekerjaan dengan Metode N Job dan M Machine untuk Memperoleh Makespan Optimal di PT. 123. [Undergraduate thesis]

Full text not available from this repository. (Request a copy)
Official URL / DOI: http://digilib.ubaya.ac.id/pustaka.php/228742
Item Type: Undergraduate thesis
Subjects: H Social Sciences > HD Industries. Land use. Labor
Divisions: Faculty of Engineering > Department of Industrial Engineering
Depositing User: Sugiarto
Date Deposited: 20 Nov 2012 07:47
Last Modified: 20 Nov 2012 07:47
URI: http://repository.ubaya.ac.id/id/eprint/1613

Actions (login required)

View Item View Item