Perhitungan Waktu Baku untuk Merencanakan Jumlah Tenaga Kerja di Pabrik Sandal PT. Halim Jaya Sakti Gempol

Tjahjono, Soeginto (1994) Perhitungan Waktu Baku untuk Merencanakan Jumlah Tenaga Kerja di Pabrik Sandal PT. Halim Jaya Sakti Gempol. [Undergraduate thesis]

Full text not available from this repository. (Request a copy)
Official URL / DOI: http://digilib.ubaya.ac.id/pustaka.php/228332
Item Type: Undergraduate thesis
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Engineering > Department of Industrial Engineering
Depositing User: Sugiarto
Date Deposited: 18 Jan 2013 02:55
Last Modified: 18 Jan 2013 02:55
URI: http://repository.ubaya.ac.id/id/eprint/2511

Actions (login required)

View Item View Item