., Tjendrawani (1998) Penjadwalan Produksi dan Perencanaan Kebutuhan Material pada C.V. Cipta Karya dengan Metode MRP. [Undergraduate thesis]
Full text not available from this repository. (Request a copy)
Official URL / DOI: http://digilib.ubaya.ac.id/pustaka.php/228437
Item Type: | Undergraduate thesis |
---|---|
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Divisions: | Faculty of Engineering > Department of Industrial Engineering |
Depositing User: | Sugiarto |
Date Deposited: | 21 Jan 2013 03:42 |
Last Modified: | 21 Jan 2013 03:42 |
URI: | http://repository.ubaya.ac.id/id/eprint/2540 |
Actions (login required)
View Item |