Liliana, Liliana (2014) SISTEM INFORMASI MANAJEMEN PROYEK INSTALASI AIR. Prosiding Seminar Nasional Teknologi Informasi dan Multimedia 2014 (SNASTIA 2014), 5. pp. 169-176. ISSN 1979-3960
Preview |
PDF
Liliana_Sistem Informasi Manajemen_2014.pdf Download (456kB) | Preview |
PDF
Liliana_publikasi 6a.pdf Download (2MB) |
Abstract
When the project is recorded conventionally, using paper or in computer files independently, often cause problems in terms of search and data storage space. Moreover, when company handles more than one project, it could lead to miscommunication, loss of data, calculation errors and so forth. To handle those problems, it takes a computer-based information system that is accessible by all parties, which can help the company's business process. This study was done using the SDLC. Based on the test results indicate that the integration between all departments make a better monitoring of the development of a project, a better recording of communication between company and clients, a better stock management, and at the end, could increase company’s profit. Keywords: Information System, Project Management, Water Installation
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Information System, Project Management, Water Installation |
Subjects: | Q Science > Q Science (General) |
Divisions: | Faculty of Engineering > Department of Information System |
Depositing User: | LILIANA |
Date Deposited: | 04 Nov 2014 06:51 |
Last Modified: | 31 May 2021 07:11 |
URI: | http://repository.ubaya.ac.id/id/eprint/21273 |
Actions (login required)
View Item |